Permit Checker Cost Calculator By State Sign Types FAQ Check My Permit ?

Sign Permit Checker

Check your permit requirements in 60 seconds. Free, no login, covers all 537 Australian councils.

100% Free
🏠 842 Suburbs
🔒 No Login Required
State
2
Suburb
3
Sign Type
4
Size
5
Heritage
6
Results

Where is your sign going?

Select your state or territory to get started.

Find your suburb or council

Type your postcode to auto-detect, or select manually.

What type of sign?

Choose the sign type that best matches your project.

🏠
Business
Identification
🗃
Fascia /
Shop Front
🏰
Pylon /
Freestanding
💡
Illuminated
Sign
🖥
Digital /
LED Screen
🋧
Awning
Sign
🪑
Window /
Decal
🏳
Banner /
Temporary

How big is your sign?

Tap a preset size or enter a custom measurement.

1m²Small window
2m²Standard fascia
3m²Large shopfront
5m²Pylon / tower
8m²Large pylon
12m²Billboard

Heritage or conservation area?

This affects your permit type, cost, and timeline.

🏝
Standard Property
Normal commercial/industrial zone. Standard permit rules apply.
🏯
Heritage Area (HCA)
Heritage conservation zone. Extra documents + longer approval.
Not Sure
We will flag this for council verification. Estimate assumes standard rules.

Your Permit Results

Get Your Permit Info in 60 Seconds

1

Enter Location

Select your state, enter a postcode, and we auto-detect your council, suburb, and heritage risk.

2

Choose Sign Details

Pick your sign type from visual cards, enter the size, and tell us about heritage constraints.

3

Get Instant Results

See your permit status, estimated council fees, approval timeline, required documents, and council contact.

Frequently Asked Questions

How accurate are the permit estimates?
Our estimates are based on publicly available council fee schedules and planning rules, updated quarterly. Accurate for 90%+ of standard sign applications. Always confirm with your specific council before lodging.
No. Small business identification signs meeting exemption criteria (size, placement, illumination, zone) may not require approval. Our tool checks exemption criteria for your specific council and sign type.
Exempt: no wait. CDC via private certifier: 10-20 days. Standard DA: 4-12 weeks. Heritage areas: 12-20 weeks. Pre-application meetings with council can speed up the process significantly.
Standard applications require: Site plan, scaled sign drawings, photos of existing site, photo montage, completed DA/CDC form, and owner consent. Heritage areas need a Heritage Impact Statement. Illuminated signs need lighting specifications.
No -- installing before approval can result in fines from $1,500 for individuals and $3,000 for corporations. Always wait for formal approval before installation.
No. This tool runs entirely in your browser. We do not store, save, or share any information. No account required, no cookies track your inputs. Estimates generated locally using public council data.

Ready to Get Your Sign Approved?

We handle the full permit process -- design, documentation, DA lodgement, and installation. Free 3D mockup included.